Lockout / Tagout (LOTO)
Control hazardous energy during maintenance with a sound lockout/tagout programme and verified isolation steps.

At a glance
- 1 day
Who it's for
- Maintenance technicians and electricians
- Operators
- Supervisors
Learning objectives
- Identify all hazardous energy sources
- Apply the LOTO procedure step by step
- Verify zero energy
- Audit the LOTO programme
Detailed content
- Electrical, mechanical, hydraulic, pneumatic
- Stored energy
- Case studies
- Notify and shut down
- Isolate and lock
- Tag
- Try-out
- Group lockout
- Restart
- Equipment procedures
- Periodic inspection
- Training records
Day-by-day agenda
A typical schedule. In-company versions are tailored to your processes, data and timing.
- Hazardous energy
- LOTO procedure
- Verification
- Programme audits
- Case study, action plans and course assessment
Practice, tools and assessment
Hands-on practice
- Site inspection and hazard spotting with photos
- Risk assessment and control hierarchy for a real task
- Incident investigation case study and report
- Calculate a simple GHG inventory (Scope 1 and 2)
Tools and templates you keep
- Risk-assessment (HIRA) form
- Inspection checklists and toolbox-talk template
- Incident investigation report
- GHG calculator (Excel)
How learning is assessed
- Pre- and post-course knowledge check
- Assessment of practical exercises by the trainer
- Action plan reviewed at the end of the course
Built on these standards and bodies of knowledge
- ISO 45001:2018
- OSHA 29 CFR 1910/1926
- NEBOSH / IOSH syllabi; NFPA codes where relevant
Certificate
Participants who complete the program and its assessment receive a certificate from The Excellence Center, which can be verified online.
New in our 2026 portfolio — tell us your dates and we will confirm the trainer and schedule.
How it is delivered
- Public courses in Cairo, in-company programs and live online training
- Practical exercises, case studies and examples from your sector
- Can also run as Train & Stay in Sharm El Sheikh, Hurghada or Cairo
Frequently asked questions
How long is Lockout / Tagout (LOTO)?
The program runs 1 day. In-company versions can be adapted to your needs.
Is the course taught in Arabic or English?
Sessions are usually delivered in Arabic with English technical terms and materials. Full English delivery is available for in-company groups.
Can you run it inside our company?
Yes. In-company programs use exercises built on your own processes. Tell us the group size and preferred timing and we will send a proposal.
Will I receive a certificate?
Participants who complete the program and its assessment receive a certificate from The Excellence Center, which can be verified online.
More programs in this field
- OHS Safety Officer
- Bolting Safety & Bolted Joint Fundamentals1 day
- Electrical Transmission & Distribution: Construction Safety and Health2 days
- First Aid at Work2 days
- Forklift & Powered Industrial Truck Safe Operation2 days
- HAZOP Study – Leader & Team Member Training5 days
- Hospital Major Incident Management2 days
- HSE Certification Exam Preparation (CHMM, CHST)5 days
- HSE Technical Short Courses1–4 days
Get dates, fees and the full outline.
Tell us whether you are joining as an individual or planning a program for your team.
