Excellence Center — When The Excellence Is Must Request a proposal
Operations, Quality & Safety

Industrial Engineering & Factory Design

“Our plant layout and capacity hold us back.”

Elaraby CQE product process design group — Excellence Center training
How we help

Layout, capacity planning, line balancing and time and motion studies.

We measure work content and capacity, model the flow, and design layout options you can compare on cost, space and throughput before you move a single machine.

Time & motion studyLine balancingCapacity planningFactory layoutSpaghetti diagramsSimulation
Elaraby CQE product process design group — Excellence Center training

What this service covers

Signs you need this

  • Material travelling long distances
  • Bottlenecks and unbalanced lines
  • Expansion plans without a capacity model

What you receive

  • Standard times
  • Capacity model
  • Layout options with trade-offs
  • Implementation priorities

Outcomes to expect

  • More output from the same space
  • Balanced workloads
  • Confident expansion decisions

Our approach

  1. Time study and work measurement
  2. Capacity and bottleneck model
  3. Layout options and flow simulation
  4. Implementation plan
FAQ

Frequently asked questions

Can you help with a new factory, not only an existing one?

Yes. We design layouts and capacity plans for greenfield sites as well as re-layouts, including pharmaceutical facility set-up.

How long does a layout study take?

Typically four to ten weeks, depending on the number of products, processes and the data available.

Tell us what you want to improve.

Share your goal and we will reply with a practical approach — a consulting proposal, an in-company program or the dates of our next public course.