Excellence Center — When The Excellence Is Must Request a proposal
Lean Six Sigma

What is DMAIC? The five phases of Six Sigma explained

DMAIC — Define, Measure, Analyze, Improve, Control — is the Six Sigma roadmap for solving process problems with data. Here is what happens in each phase and which tools to use.

Published · The Excellence Center

Lean Six Sigma team project presentation — Excellence Center training

DMAIC is a five-phase, data-driven method for improving an existing process: Define, Measure, Analyze, Improve and Control. It is the core roadmap of Six Sigma and Lean Six Sigma projects, and it works because each phase must be completed with evidence before the team moves on.

Define: agree the problem and the goal

The team writes a project charter that states the problem, the goal, the scope and the business case. It captures the voice of the customer and draws a high-level SIPOC map so everyone sees where the process starts and ends.

  • Tools: project charter, voice of the customer, CTQ tree, SIPOC

Measure: establish the baseline

The team collects data on how the process performs today and checks that the measurement system can be trusted. Without a reliable baseline, nobody can prove an improvement later.

  • Tools: data collection plan, process map, measurement system analysis, control charts, process capability

Analyze: find and verify root causes

Instead of jumping to solutions, the team lists possible causes and tests them with data. Only causes confirmed by evidence move forward.

  • Tools: fishbone diagram, 5 whys, Pareto chart, hypothesis tests, regression, value stream map

Improve: design and test solutions

Solutions are generated for the verified root causes, risk-assessed and piloted on a small scale before full roll-out.

  • Tools: brainstorming, FMEA, quick changeover, error proofing, design of experiments, pilot plans

Control: hold the gains

The new way of working is standardized and monitored so performance does not slip back. The process owner takes over from the project team.

  • Tools: control plan, standard work, visual management, control charts, response plan

When should you use DMAIC?

Use DMAIC when an existing process has a measurable problem whose cause is not obvious. If the solution is already known, a Kaizen event or a simple action plan is faster. For a process that does not yet exist, Design for Six Sigma (DMADV) is more suitable.

FAQ

Frequently asked questions

How long does a DMAIC project take?

Typically three to six months for a Green Belt project, depending on data availability and scope.

Is DMAIC only for manufacturing?

No. Banks, hospitals, contact centers and government services use DMAIC to reduce errors and turnaround time.

Tell us what you want to improve.

Share your goal and we will reply with a practical approach — a consulting proposal, an in-company program or the dates of our next public course.