Excellence Center — When The Excellence Is Must Request a proposal
Supply Chain, Logistics & Procurement

Advanced Resource Planning (MPS, MRP, CRP) with Primavera

Advanced resource planning for complex, engineer-to-order manufacturing. Participants build MPS, MRP and CRP plans, load machines and prioritise jobs, level resources, track execution and integrate production plans with Primavera schedules.

Catapult exercise team — Excellence Center training

At a glance

Catalog codeH01
Duration
  • 5 days
LevelAdvanced
Program typeTechnical
LanguageEnglish / Arabic
DeliveryIn-house · Public · Online

Who it's for

  • Resource/production planners, operations, project and supply-chain professionals in engineer-to-order manufacturing

Learning objectives

  • Build MPS, MRP and CRP plans
  • Load machines, prioritise jobs and level resources
  • Integrate production plans with Primavera schedules

Detailed content

01Planning hierarchy
  • Sales and operations plan to master schedule
  • Master production schedule (MPS) and time fences
  • Available-to-promise
02Material requirements planning
  • Bills of materials and lead-time offsetting
  • Lot-sizing rules
  • MRP exception messages
03Capacity planning
  • Rough-cut capacity planning
  • Capacity requirements planning (CRP)
  • Load vs capacity and levelling
04Shop-floor control
  • Machine loading and job priority rules
  • Downtime management and real-time tracking
  • Feedback and reporting
05Scheduling in Primavera P6
  • Gantt and critical path
  • Resource assignment and levelling
  • Scenario planning and cost control

Day-by-day agenda

A typical schedule. In-company versions are tailored to your processes, data and timing.

01Day 1
  • Planning hierarchy
02Day 2
  • Material requirements planning
03Day 3
  • Capacity planning
04Day 4
  • Shop-floor control
05Day 5
  • Scheduling in Primavera P6
  • Case study, action plans and course assessment

Practice, tools and assessment

Hands-on practice

  • Solve a real problem with 8D or A3 from containment to verification
  • Fishbone and 5-Why workshop with evidence checks
  • Capacity and line-balancing exercise with takt time
  • Time study of a real operation and standard-time calculation

Tools and templates you keep

  • 8D report and A3 templates
  • Root-cause verification checklist
  • Capacity planning and line-balancing workbook
  • Time-study sheet with allowances

How learning is assessed

  • Pre- and post-course knowledge check
  • Assessment of practical exercises by the trainer
  • Action plan reviewed at the end of the course

Built on these standards and bodies of knowledge

  • Ford 8D / VDA problem-solving guidance
  • ASQ Quality Improvement tools
  • ASCM CPIM Body of Knowledge

Certificate

Excellence Center Certificate of Attendance

Verify a certificate

How it is delivered

  • Public courses in Cairo, in-company programs and live online training
  • Practical exercises, case studies and examples from your sector
  • Can also run as Train & Stay in Sharm El Sheikh, Hurghada or Cairo

Part of these career paths

FAQ

Frequently asked questions

How long is Advanced Resource Planning (MPS, MRP, CRP) with Primavera?

The program runs 5 days. In-company versions can be adapted to your needs.

Is the course taught in Arabic or English?

Sessions are usually delivered in Arabic with English technical terms and materials. Full English delivery is available for in-company groups.

Can you run it inside our company?

Yes. In-company programs use exercises built on your own processes. Tell us the group size and preferred timing and we will send a proposal.

Will I receive a certificate?

Participants who complete the program and its assessment receive a certificate from The Excellence Center, which can be verified online.

Get dates, fees and the full outline.

Tell us whether you are joining as an individual or planning a program for your team.